We developed this blog to provide golf course maintenance information to our members. From projects, small and large, to updates on course conditions, we want to provide as much information as possible. Although we hope this blog answers all of the pertinent questions regarding our operation, we always welcome more personalized dialogue. If you have questions beyond the information found on this blog, feel free to contact our golf course superintendent, Trevor Hedgepeth.

thedgepeth@kinlochgolfclub.com

804-840-8320


Monday, January 18, 2016

Winter Projects Update 1-18-2016



#12 Fairway Bunker(s) Renovation 


We began by removing all of the sod within the construction limits. We also removed all of the existing sand in the bunkers. The removed sand was transported to our range traps. It was very clean and in great condition, so using it elsewhere was an easy decision. 

 

Sod removal in progress. 2 sod cutters and 5-6 staff members cut, rolled and removed about 22,000 square feet in 10 hours. 


Irrigation heads being removed and capped at the lateral service tee. Should we not impact the pipe, we can re-attach the head. Otherwise, we will trench new pipe wherever disturbed. 


 All of the sod in rolls, ready to be moved. We were dealing with freezing nights so we cut and rolled until dark. The next morning, when the ground was frozen, we were able to move the sod off-site. 


Monday, January 11, 2016

Winter Projects Update 1-11-2016





 View from the new back tee on #3


#3 Tee - Grubbing complete; shaping to begin soon. 


Another shot of the new tee complex on #3 


Trees have been cleared and grubbed for the new back tee on #6


Wednesday, January 6, 2016

2016 Golf Course Improvement Projects

2016 should be an exciting year for Kinloch Golf Club. We have a full tournament slate and the golf course did well in 2015. In addition, our club has decided to complete several golf course improvement projects. To keep our membership updated on our progress, we will use this blog to post updates and photos as different projects are underway. Look for updates on a weekly basis. Indeed, 2016 should be an exciting year for Kinloch Golf Club.



The tee site on #3 (pre-clearing) 


The cleared site looking back. 


The view from the new tee location 


Tuesday, December 1, 2015

Annual Reminder: Off-Season Deep Tine and Vertical Mowing Has Begun

One of our top golf course maintenance goals is to provide firm fairway surfaces throughout the growing season. To accomplish this goal, there are many "behind the scenes" practices that must be consistently executed. Two of theses practices that are key to our fairway conditioning is deep tine aeration and vertical mowing. Before we get into a description of these practices, let's address a question that may be going through your mind as you read this blog.

1. With 2+ weeks of course closure for aeration (spring and fall) why do we disturb the playing surfaces while open?

Following the Thanksgiving Holiday, daily play at KGC slows tremendously. So, although disturbing the surfaces, this pocket of time represents the best balance between slow play and actively growing (albeit much slower) grass. Secondly, the disruption is mostly aesthetic and not functional. In other words, the shot off of the fairway is not terribly compromised during these processes. And finally, but most importantly, we do not have the time to get these practices done in March and its too hot in mid-to late August. During our March aeration, we hollow-core aerate and top dress the entire property and that alone takes all of our efforts during Spring Aeration.

So, as you read the description and benefits of these practices, please understand that we are cognizant of the disruption and will pace ourselves so that only 1-2 fairways will be disturbed at a time. As always, we appreciate your support as we try to make KGC better each season.


Deep Tine Aeration 

This process is a form of solid tine aeration. There are no plugs or cores; only a "punched hole." What makes this operation unique and crucial is the depth of the hole. This particular machine is able to puncture the turf to a depth of 6-8" at a diameter of 3/4". Furthermore, the machine is designed to "kick" as the tines go in and out of the soil. This "kicking" fractures the soil creating additional pore space between the visible holes. The end result is that we are able to promote deeper, denser rooting. Deeper, denser rooting allows the plant to survive drier conditions. So in the summer months, the plant requires less irrigation to make it through the hot days. This in turn allows us to promote firmness throughout the driest stretches of summer. 




Vertical Mowing 

This process is designed to remove thatch. Thatch is the by-product of growing grass and is comprised of dead and decaying plant material. Although soil microbes help to decompose thatch, there is a plant protein called lignin that is very difficult for "bugs" to digest. Over time, this lignous material builds upon itself until you are left with a soft, spongy layer called thatch. Aside from creating a sponge effect on the surface, thatch can be a breeding ground for insects and disease. Vertical mowing uses special blades to go down into the canopy at a depth of 1/2" and mechanically pull-out and remove thatch. The aftermath is continuous channels 1.5" apart that are 1/2" deep. As we beat back back the thatch through vertical mowing, core aeration and sand top-dressing, we increase water and nutrient efficiency while reducing the sponginess of thatch itself.