We developed this blog to provide golf course maintenance information to our members. From projects, small and large, to updates on course conditions, we want to provide as much information as possible. Although we hope this blog answers all of the pertinent questions regarding our operation, we always welcome more personalized dialogue. If you have questions beyond the information found on this blog, feel free to contact our golf course superintendent, Trevor Hedgepeth.

thedgepeth@kinlochgolfclub.com

804-840-8320


Thursday, January 11, 2024

Slinging Sand, Poking Holes and Felling Trees

 As 2024 settles in, we wanted to update you on our offseason projects and priorities. While we are not disturbing the golf course with "construction-type" activities, there is some work that will impact playing conditions. Bunker restorations, cart path replacements, rough aeration, fairway drainage and tree work will be the bulk of our offseason endeavors. 

1. Bunker Restorations 

In 2019 the bunkers at Kinloch were converted to the Better Billy system and new sand was installed throughout. While the underlying drainage will work miracles for years to come, the sand depths erode on an annual basis. Last season, we restored many of the green-side bunkers and this off-season, we are restoring all of the fairway bunkers. Contaminated sand is removed, the depths are evaluated and new  sand is installed to bring all of the depths to a consistent level. Additionally, we are "pulling" sand higher up the faces so that the bunker edge will be more turf/thatch than soil. While we are very excited to restore the sand in our bunkers, this project will be ongoing throughout the winter. We would like to encourage you to play "lift, rake and place" during the winter months. 


2. Cart Path Replacements 

Replacing sections of our cart paths will be an ensuing project almost every off-season. This work should have minimal impact to member play, but should you be in a cart, you may encounter areas that need to be avoided. To date, we have already excavated, formed and re-poured 20 sections of cart path on the 4th and 10th holes. 



3. Rough Aeration 

One of our agronomic objectives in 2024 is to increase the frequency in which we aerate the primary rough. As turf ages, organic matter/thatch accumulates and plant health issues can increase. While we have always aerated our primary rough 2 times per growing season, we have decided to increase that frequency to 3 or 4 times per season. All of these aerations will be confined to the off-season, but to aerate 100+ acres 3 to 4 times, we must keep the machines running whenever Mother Nature allows. So, as you play the golf course over the next 75 days, you may encounter the "plugs" from this process. While we certainly apologize for the inconvenience, the benefits that we will see next summer will make this process well worth it. 

In addition to the activities described above, you will also see select tree clearing, new bridge construction and fairway drainage installed throughout the 13th fairway. We are very excited about these objectives and are certain they will help lay the foundation for an outstanding, 2024 Golf Season!